 |
| |
| For cable switch board (screened & unscreened) |
 |
| |
NOTE:
3. Deviation from the specified limits of the quality check parameters is resolved as per the procedure for control of Non-Conforming products (Q-SYS-P-02)
4. Availability of resources and information necessary to support the operation and monitoring of the above process is ensured as per the Process for Provision of Resources (Q-SYS-P-05) |
|